Long Lead walker sitting on a front porch step, smiling as she dries a muddy golden retriever's paw with a towel

Home/Meet us

Meet us

Small team. Big walks.

Four walkers who know every dog by name, and the rules we never bend to keep them safe.

Walker in a green jacket and orange beanie walking a golden retriever and a Bernese mountain dog down a leafy street of brick houses
4 walkerswho know every dog by name

Our story

It started with one beagle.

Jess walked her neighbor’s beagle around Kettering every lunchtime for a year. Then the people across the street asked, then their friends in Oakwood, and Long Lead was born.

We’ve stayed small on purpose. Four walkers, short drives, and groups of no more than four, so every dog gets a real walk and every owner gets a real note afterwards.

Jess, founder

The walkers

Who’ll be holding the lead.

All four are background-checked, insured and trained in dog first aid. You’ll meet yours at the meet & greet.

Jess, smiling on an autumn trail with a golden retriever and a beagle on leads
Founder · Kettering

Jess

Runs the Kettering morning walks and the schedule, and walks Bailey most weekday mornings. Will remember your dog’s birthday.

At home: Maple, the beagle who started it all

Marcus in a navy beanie crouching on a leafy sidewalk beside a black lab on a lead
Big & nervous dogs · Oakwood, south Dayton

Marcus

Patient with shy rescues and strong pullers alike. Runs the big-dog groups in Oakwood and south Dayton.

At home: Duke, the black lab in the photo

Claire in a mustard rain jacket on a riverside path with two small terriers on leads
Puppies & older dogs · Centerville, Bellbrook

Claire

Puppy visits, gentle strolls and the slow sniff walks along the Iron Horse Trail.

At home: Pip, a fourteen-year-old terrier

Dani kneeling in a front hallway, clipping a lead onto a goldendoodle's harness
Groups, puppies & drop-ins · Beavercreek

Dani

Beavercreek groups, puppy visits and holiday drop-ins. Out in every weather, snow included.

At home: Luna, a husky who loves winter

Keeping dogs safe

The rules we never bend.

Handing over your keys and your dog is a big deal. Here’s exactly how we look after both.

01

Meet & greet first, always

No dog goes out with us until we’ve met at home, learned the routine and written down the quirks, the vet and the emergency contact.

02

Groups of four, matched

Never more than four dogs. We group by size, energy and temperament, and every new dog does a trial walk before joining.

03

Keys coded, never labeled

Your key goes on a numbered tag with no name or address, kept in a locked key box. It’s handed back the day you stop walks.

04

Licensed & insured

Every walker is background-checked and covered by our insurance on every walk and visit. Ask to see the certificate at the meet & greet.

05

On lead, always

Streets and parks are on lead. Long leads on open trails; off lead only in a fully fenced field, with your written OK.

06

You hear about everything

A limp, a sore paw, a skipped meal: it goes in the note straight away. If something’s wrong, we call you and your vet.

How we match groups

A group is a team, not a crowd.

An example week. Groups are capped at four, and a dog only moves group if it’s better for them.

Big & bouncyTue & Thu · 9am
  • RRockyboxer
  • ZZiggyblack lab
  • OOtisshepherd
  • 1 spot left
Small & steadyMon, Wed, Fri · 11am
  • RRosiecavalier
  • SScruffborder terrier
  • MMilobeagle
  • PPeanutYorkie mix
Slow sniffersMon–Fri · 2pm
  • GGus12, basset
  • HHazel11, spaniel mix
  • 2 spots left
Walker in a knit hat and green parka walking a husky and a German shepherd through a snowy forest

Bad weather

Rain, snow or a heatwave.

Ohio weather does what it likes. Here’s what we do, and we always text before changing anything.

  • RainWe walk. Most dogs don’t mind, and everyone gets a towel-down at the door.
  • Snow & iceWe walk on cleared routes, check paws for salt and ice balls, and towel off. On sheet ice we swap to an indoor visit.
  • Heat (above 85°F)Early or late walks, shaded routes, shorter loops and extra water. Pavement too hot for your hand means grass only.
  • ThunderstormsNo walking in lightning. We swap to an indoor visit (play, potty break, company) at the same price.

Come and meet us.

Twenty minutes at your home, free. Meet your walker, ask anything, and decide after.