Smiling walker in a beanie walking a black lab and a golden retriever along a leafy sidewalk lined with autumn trees

Home/Walks & prices

Walks & prices

Simple prices, proper walks.

Per walk, pick-up included, no sign-up fee. Every walk ends with a photo and a note on your phone.

The price list

What it costs.

Every price below includes pick-up from your door, fresh water, a towel-down and the photo + note. Walks run Monday to Friday, 7am to 7pm; weekend visits on request.

Every single walk

What a walk includes.

The same routine every time, so your dog knows what’s coming and you know what happened.

Picked up from your door

We let ourselves in with your coded key and say hello properly.

Harness & lead checked

Clips and fit checked before we step outside, every time.

Fresh water on the way

A collapsible bowl and a bottle on every walk, and more on hot days.

Always bagged

Picked up and binned. Every time, every dog.

Muddy paws towelled

A towel-down at the door, so the mud stays outside.

Water bowl topped up

Fresh water at home before we leave.

Door locked behind us

Checked twice. The key goes back on its coded tag.

A photo + a note

On your phone within minutes of the walk ending.

The after-walk message

The text you’ll look forward to.

Written by the walker who was there, not a template. Here are three from one Tuesday.

Jess · 10:42 AM
Bailey the golden retriever in a navy harness on a trail, looking up happily

Bailey did a full loop of Delco Park, drank lots, one muddy paw. Back home 10:42.Solo walk, 60 min

Dani · 1:15 PM
Pepper the cream puppy sitting on a kitchen floor next to her lead and water bowl

Pepper ate all her lunch, two wees in the yard and a big zoomies session. Asleep in her crate before I left at 1:15.Puppy visit, 20 min

Claire · 3:05 PM
Ollie and Nell, two small terriers on blue and red leads, sniffing a pile of autumn leaves beside a paved trail

Ollie and Nell sniffed every leaf pile on the Iron Horse Trail. Water at the halfway bench, both bagged. Home 3:05.Solo walk, 2 dogs, 30 min

The week planner

Build your dog’s week.

Pick your dogs, the kind of walk and the days. You’ll see the weekly price straight away, with the pack saving when it applies. Nothing is fixed until the free meet & greet.

1How many dogs?Extra dog from the same home: +$8 a walk
2What kind of walk?Prices per walk, pick-up included
3Which days?Tap to add or remove
Sat–Sunvisits on request

Questions

Good to know.

Do you walk in the rain?

Yes. Most dogs don’t mind rain, and we towel them off at the door. In thunderstorms, ice or extreme heat we swap the walk for an indoor visit (play, potty break, a cuddle) at the same price, and we text you first. More on the bad weather page.

Are dogs ever off lead?

Not on streets or in parks. Off-lead time only happens in a fully fenced field, and only with your written OK at the meet & greet. That’s where the name comes from: on open trails we use a long lead, so dogs can sniff and wander while still attached.

What if my dog doesn’t get on with the group?

Then they don’t go in a group. We match groups by size and temperament and start new dogs with a trial walk. Some dogs are happier on solo walks, and that’s fine.

Will it be the same walker every time?

Wherever we can, yes. If your walker is off sick or on holiday, a named backup who has already met your dog takes over, and we tell you in advance.

Can I cancel or change a walk?

Of course. Text or call by 7pm the day before and there’s no charge. Your walker confirms the exact cancellation terms at the meet & greet.

Do you give treats?

Only if you say so, and only the treats you choose. Allergies and diets go in your dog’s notes at the meet & greet.

Ready when they are.

Book the free meet & greet and we’ll plan the walks around your dog, not the other way round.